19.4.1921 | Military aviation started with the procurement of two Bristol F.2b. | |
1924 | The Escuela Nacional de Aviación was formed. | |
14.4.1931 | The aviation school became part of the Ministry of War, Marine and Aviation. | |
25.2.1936 | Fuerza Aérea y Escuela de Aviación Militar was formed. | |
1954 | The FAEAM became an independent service and was renamed Fuerza Aérea Hondureña (FAH). | |
1957 | Frontier conflict with Nicaragua. | |
14.7.1969 | The so called "El Guerra de 100 Horas" between El Salvador and Honduras started. | |
5.8.1969 | After pressure from the OAS, El Salvador withdraw its troops from Honduras. | |
21.5.1985 | Honduras and the USA signed an agreement for the further use of Palmerola AB. |